2018

Tanami Gas Pipeline - MPC Kinetic

Tanami Gas Pipeline is a 440km long 8-inch pipeline which transports up to 13TJ per day of natural gas. The Tanami Gas Pipeline will provide gas to Newmont’s Granites gold mine, located approximately 550km north-west of Alice Springs in the remote Tanami Desert. The pipeline is estimated to provide the Tanami gold mine with a safe and reliable energy source that lowers power costs and carbon emissions by 20 per cent.

2018

NGP Gas Pipeline Project - Spiecapag

Also known as the North East Gas Interconnector Line (NEGI). The 622 km pipeline links Tennant Creek in the Northern Territory to Mount Isa in Queensland. The line is estimated to be able to carry 90 TJ/day of gas through a 12-inch diameter pipe. 

2018

QGC / BGC Gathering Project - MPC Group

Lorem ipsum dolor sit amet, consectetur adipiscing elit. Vestibulum ultricies sollicitudin ante nec mattis. text to go here

2018

VNIE Stage 5 - Spiecapag​

The Victorian Northern Interconnect Expansion Project (VNIE) is the APA Group’s response to the transitioning gas market in eastern Australia, with the aim of developing the pipeline grid in the east coast.

$600 million is being spent on upgrades, increased capacity and bi-directional flows, and $200 million of this will be used to increase the flow of gas from Victoria and into NSW.

2018

QGC Charlie Project - MPC Group

Queensland Gas Company (QGC) continued the hunt for reserves, expanding its natural gas tenements in Queensland through Project Charlie.

With Australia’s LNG industry emerging from its construction boom, QGC’s Project Charlie boosted Australia’s gas production through a $1.7 billion investment in infrastructure and wells.

Project Charlie was a two­ year gas development project by QGC and its joint venture partners China National Offshore Oil Corporation and Tokyo Gas.

Gas developed from Project Charlie is available to either meet domestic gas supply commitments, or production needs at the QCLNG Plant on Curtis Island.

2018

Olympic Dam Waterline - BHP

Olympic Dam is made up of underground and surface operations and operates a fully integrated processing facility from ore to metal.

The underground mine is made up of more than 450 kilometres of underground roads and tunnels. 

The expansion introduces a new open pit mining operation, together with n increased capacity to process minerals and additional infrastructure to support expanded operation. 

2018

Atlas Project - Santos

Project Atlas is on 58 square kilometres of land the Queensland Government granted for domestic-only gas production in March 2018.

Project Atlas will feeds coal seam gas to Jemena’s 15 petajoule per annum gas processing facility connected to the 60km buried pipeline that will process and transport gas from Wandoan in south-west Queensland’s Surat Basin to the Wallumbilla Hub.

Shutdowns

PSSS was the proud supplier for the following major Projects:

Initec Pivot

APLNG

GLNG

QGC / Shell